Opens in a new tab

Non-warrantable condos in South Florida: why it happens and how buyers still finance

From Aventura and Sunny Isles Beach to Hollywood, Fort Lauderdale, and Boca Raton, buyers increasingly hear the same news after making an offer: the building is non-warrantable. It sounds final, but it usually is not. It means one specific kind of loan is off the table, and it tells you exactly what to investigate before you commit your deposit.

Start here

What non-warrantable really means

Most conventional mortgages are sold to Fannie Mae or Freddie Mac. Before they will buy a condo loan, the building itself has to meet their project standards. A building that meets them is called warrantable. A building that does not is non-warrantable.

The label is about the condominium project, not about you. A buyer with excellent credit, strong income, and a large down payment can still be told that a standard conventional loan is not available in a particular building. The same buyer might qualify easily in the tower next door.

What non-warrantable does not mean: that the building is unsafe, that the unit cannot be financed, or that the status is permanent. It means the loan has to come from a lender willing to hold it, or from a government program with its own approval path. If you want the full picture of how lenders review a building, start with our guide to buying a condo in Florida.

The local picture

Why it is so common in South Florida

Non-warrantable buildings exist everywhere, but several of the most common triggers are concentrated in South Florida’s coastal condo market.

  • Critical repairs and failed inspections

    Fannie Mae treats a project as ineligible when it needs repairs that significantly affect safety, structural integrity, or habitability, or when it fails a mandatory structural inspection, until the work is completed and documented. Its guide specifically lists items such as sea walls, balconies, waterproofing, parking structures, and load-bearing elements. Salt air and storms make these familiar issues in coastal buildings.

  • Large unfunded repairs

    Unfunded repairs costing more than $10,000 per unit that should be done within 12 months make a project ineligible. Repairs funded by a special assessment are excluded from that test, but an assessment tied to a critical repair that has not been remediated still makes the project ineligible.

  • Hotel-style and short-term rental buildings

    Projects operated like hotels, with mandatory rental pools, hotel licensing, front-desk registration, or daily cleaning, are ineligible. Fannie Mae also flags resort-area locations, heavy short-term rental advertising, and buildings where 75% or more of units are investment or second homes for added review.

  • Litigation

    A project is generally ineligible when the association is a party to pending litigation, with limited exceptions for minor matters. Construction-defect suits filed by the association are generally not considered minor.

  • Concentrated ownership

    In projects with 21 or more units, one entity generally may not own more than 20% of the units. In smaller projects, the limit is generally two units.

  • Commercial space

    No more than 35% of the project, or of the building that contains it, may be commercial or mixed-use space. Rental apartments and hotel space inside the project count as commercial.

The scale is significant. Fannie Mae keeps a list of projects it will not buy loans in, marked as Unavailable in its Condo Project Manager system, and loans in those projects are ineligible for sale to Fannie Mae. The list is shared with lenders, not the public. In April 2025, the Miami Herald reported that a law firm that obtained a copy counted 696 buildings in Miami-Dade, Broward, and Palm Beach counties on it as of that March, out of 1,438 statewide.

What is new

The 2026 agency changes buyers should know

In March 2026, Fannie Mae issued Lender Letter LL-2026-03, aligned with a Freddie Mac bulletin, updating condo project standards and insurance requirements. Three changes matter most for South Florida buyers:

ChangeApplies to loan applications datedWhat it means
Per-unit master policy deductible capped at $50,000On or after July 1, 2026Buildings with very high per-unit deductibles may no longer qualify.
Limited and streamlined reviews retiredOn or after August 3, 2026Most projects now need a full review, unless they qualify for a waiver of project review.
Minimum reserve allocation rises from 10% to 15% of budgeted incomeOn or after January 4, 2027Associations that budget less may fail the review unless a qualifying reserve study supports their funding.

Sources: Fannie Mae Lender Letter LL-2026-03 (March 18, 2026), as summarized by Florida Realtors and association law firms. Freddie Mac requirements may differ in detail.

Under the new reserve rules, an association that relies on a reserve study instead of the percentage test needs a study completed within the past three years, and it can no longer use the baseline funding method, which lets reserves fall close to zero. For buyers, the practical effect is that more buildings receive a detailed review, and budgets, reserves, and insurance deductibles are examined closely on every conventional condo loan.

Florida law

Florida’s inspection and reserve rules, and why they reach your loan

Florida’s post-2022 condo safety laws are a big reason so many repairs, assessments, and dues increases are surfacing at the same time.

Milestone inspections

Condominium buildings three habitable stories or more in height must complete a milestone structural inspection by December 31 of the year the building reaches 30 years of age, measured from its certificate of occupancy, and every 10 years after that. Local officials may require the first inspection at 25 years based on local conditions such as proximity to salt water. In practical terms, a building that received its certificate of occupancy in 1996 or earlier reaches 30 years by the end of 2026.

Structural integrity reserve studies

Associations for buildings three habitable stories or higher must have a structural integrity reserve study, or SIRS, covering components such as the roof, structure, waterproofing, plumbing, electrical systems, and windows. The 2025 condo law, HB 913, extended the deadline for the first study to December 31, 2025, and gave associations new funding tools:

  • A temporary reserve pause

    After a milestone inspection that finds necessary repairs, owners can vote to pause reserve contributions for up to two consecutive annual budgets so the money goes to those repairs. The option applies to budgets adopted on or before December 31, 2028, and a new SIRS is required before funding resumes.

  • Loans and lines of credit

    With a majority vote of the voting interests, associations may fund required reserves or repairs with loans or lines of credit, not only assessments.

These tools can make ownership more affordable in the short term. They also mean you should read the budget carefully: a paused reserve contribution or a new association loan is exactly the kind of detail a lender’s full review will examine.

Where we work

What it looks like in the cities we serve

Every building is reviewed on its own, so a city never decides the outcome. Still, the building types common in each area tend to raise similar questions.

  • Miami-Dade coast

    In Aventura, Sunny Isles Beach, Bal Harbour, and North Miami, many buyers are looking at oceanfront and bayfront towers. Ask about milestone findings, balcony and garage repairs, the windstorm deductible, and, in resort-style buildings, rental programs and hotel services.

  • Miami

    In Miami, mixed-use towers with retail, offices, or hotel components raise the commercial-space question, and newer projects may still have high investor or developer ownership.

  • Broward beaches

    Along the coast in Hallandale Beach, Hollywood, and Fort Lauderdale, focus on building age, inspection and SIRS status, recent or planned assessments, and short-term rental rules.

  • Palm Beach County

    In Boca Raton and West Palm Beach, the same checklist applies, along with owner-occupancy mix in seasonal communities and any litigation involving the association.

Your options

Ways to finance a non-warrantable condo

The right path depends on why the building is non-warrantable. A building with a minor issue may still fit a government program, while one with unresolved critical repairs may only fit a portfolio lender, if any.

  • Portfolio and non-QM condo loans

    Some lenders keep these loans in their own portfolios and set their own building standards, often for primary homes, second homes, and investment properties. Terms are lender-specific, and buildings with serious unresolved safety issues may still be declined. See non-warrantable condo loans.

  • FHA Single-Unit Approval

    If the building is not FHA-approved, FHA may approve an individual unit in a completed project with at least five units, provided the project meets a subset of FHA’s requirements, including limits on how many units can carry FHA-insured loans and the project’s financial condition. See FHA loans.

  • VA financing

    VA maintains its own condominium approval process, so eligible veterans should check the building’s VA status early. See VA loans.

  • Condotel programs

    For buildings run like hotels, specialized lenders offer condotel financing with their own rules. See condotel loans.

  • Cash now, refinance later

    Some buyers purchase with cash and refinance after the building’s issue is resolved. That only works if the status actually changes, so treat it as a possibility, not a plan.

Run the numbers

Comparing the trade-offs

A non-warrantable loan can be the right tool, but compare it on more than the interest rate:

  • Down payment and reserves

    Portfolio programs often require more cash at closing and more reserves after closing than agency loans.

  • Rate and fees

    Pricing is set by the lender and is often higher than conventional pricing for a similar borrower.

  • Loan features

    Ask about adjustable-rate structures and prepayment penalties, which some programs use, particularly for investment properties.

  • Building costs

    Add expected dues increases and any approved or likely special assessments to your monthly budget.

  • Resale

    Future buyers will face the same financing limits unless the building’s status changes, which can affect how quickly and at what price you can sell.

Looking ahead

Can a building become warrantable again?

Yes, it can. Fannie Mae’s guide says a project with unaddressed critical repairs is ineligible until the repairs are completed and documented, and lenders review an engineer’s report or similar document to confirm the issues are resolved. Litigation can end, delinquencies can fall, and ownership concentration can drop as units sell.

Eligibility is reviewed again for every new loan, so improvement is never guaranteed on a schedule. When you evaluate a unit, look at board minutes, the repair timeline, and how the work is funded. A clear, funded plan is a good sign for both your future costs and your future refinance options.

Sources

Before you write an offer

Twelve questions to ask about a non-warrantable building

Bring these to your agent, the listing agent, or the association. The answers decide which loans are realistic and what the unit will really cost to own.

  • Has a lender already reviewed this building, and what was the outcome?

  • Which issue makes the building non-warrantable, and is it expected to be resolved?

  • Has the building completed its milestone inspection, and are the findings repaired?

  • Is there a current structural integrity reserve study, and is the budget funding it?

  • Has the association paused reserve contributions or borrowed to fund repairs?

  • Are any special assessments approved, proposed, or under discussion?

  • Is the association a party to any lawsuits?

  • What is the master policy's per-unit deductible, including windstorm?

  • What share of owners are 60 or more days behind on dues?

  • Does one person or company own a large share of the units?

  • Are short-term rentals allowed, and is there any rental pool or hotel-style service?

  • How much commercial space is in the building, if any?

Clear answers

Non-warrantable condo questions

A condo is called warrantable when its building meets the project standards Fannie Mae or Freddie Mac set for the conventional loans they buy. A non-warrantable building falls outside those standards, for example because of critical repairs, pending litigation, too much commercial space, concentrated ownership, or hotel-style operation. The term describes the building, not the buyer.

Often, yes. Some portfolio and non-QM lenders keep these loans on their own books and set their own building standards. Expect different terms than a standard conventional loan, typically a larger down payment, more reserves, or higher pricing. Some buildings may also qualify for FHA Single-Unit Approval or VA financing, depending on the reason the building is non-warrantable.

Not by itself. Under Fannie Mae’s guidelines, lenders review each special assessment’s purpose, status, amount, and payoff date. If the assessment is tied to a critical repair that has not been remediated, the project is ineligible. Assessments for routine maintenance or capital replacements are treated differently.

Fannie Mae and Freddie Mac retired their lighter limited and streamlined project reviews for loan applications dated on or after August 3, 2026, so most buildings now need a full review unless they qualify for a waiver. Fannie Mae also capped the per-unit deductible on a master policy at $50,000 for applications dated on or after July 1, 2026, and its minimum reserve allocation rises from 10% to 15% of the budget for applications dated on or after January 4, 2027.

It can be, because your future buyers face the same financing limits unless the building’s status changes. That can narrow the pool of buyers to those paying cash or using specialized loans. Factor resale into your price, and ask what the association is doing to resolve the underlying issue.

Possibly, if the building later meets agency standards, for example after critical repairs are completed and documented, litigation ends, or delinquencies fall. Project eligibility is reviewed again at the time of each new loan, so there is no guarantee. Plan your purchase around the loan you can get today.

Talk with Julia

Found a unit in a non-warrantable building?

Send Julia the address. She will help you find out why the building was flagged and which financing paths are still open.

This article is educational and general in nature and is not legal advice. Agency guidelines, Florida condominium laws, and loan program requirements change and vary by lender, building, and transaction. Review contracts and association documents with a qualified Florida real estate attorney. This is not a commitment to lend.